In 2026, Ecocem and Belgian precast specialist C-concrete produced two full-scale precast elements using Ecocem ACT at C-concrete’s factory near Antwerp. Both were made under normal production conditions, using the plant’s existing equipment and processes. It was the first time ACT had been demonstrated in industrial-scale precast production.

Precast is one of the most demanding environments for any cement. Factories depend on fast early strength, consistent quality and efficient demoulding to keep production on schedule. A new cement has to fit into that process without slowing it down.

ACT did exactly that. It integrated into C-concrete’s production line with no changes to established manufacturing practices, and met the performance requirements of industrial precast.

Project snapshot

  • Location: C-concrete production facility, near Antwerp, Belgium
  • Partner: C-concrete (part of Cordeel Group)
  • Application: Precast concrete
  • Elements produced: 10 × 3m fire-resistant wall and 8 × 3m insulated sandwich wall
  • Carbon reduction: 67.5% (LCA by C-concrete)
  • Date: 2026

 

The results
A Life Cycle Assessment carried out by C-concrete found that using ACT cut the carbon footprint of both elements by 67.5%

“The feedback from our production team has been extremely positive. ACT performs like conventional cement while delivering a significantly lower carbon footprint.”

Nikolas Schack  |  Quality Manager and Concrete Technologist, C-concrete

“Collaborations like this are essential to accelerating more sustainable construction. Demonstrating new technologies under real production conditions gives the industry confidence that lower-carbon solutions are ready for wider adoption.”

Simon Maillet  |  Sustainability Manager at Cordeel Group